Microsoft unveils new data center design that aims to enable zero-water cooling
Microsoft has announced the launch of a new data center design with zero water cooling technology that can optimize AI workloads and achieve zero cooling water consumption. By adopting chip-level cooling solutions, precise temperature control can be achieved without water evaporation, aimed at protecting local watersheds and addressing water resource pressures. Microsoft said that its current fleet will still use a mix of air-cooled and water-cooled systems, but the new projects in Phoenix, Arizona and Pleasant Prairie, Wisconsin will test zero water evaporation design in 2026.
Disclaimer: The content of this article solely reflects the author's opinion and does not represent the platform in any capacity. This article is not intended to serve as a reference for making investment decisions.
You may also like
[Initial Listing] Bitget Will List EarnM (EARNM). Come and grab a share of 5,632,000 EARNM!
We are thrilled to announce that EarnM (EARNM) will be listed in the Innovation, Web3 and DePin Zone. Check out the details below: Deposit Available: Opened Trading Available: 19 December 2024, 14:00 (UTC) Withdrawal Available: 20 December 2024, 14:00 (UTC) Spot Trading Link: EARNM/USDT Activity: P
Wormhole has integrated Circle’s cross-chain transfer protocol on Sui
AR breaks through $20